Greenlee 1800 mechanical bender chart for rigid conduit
Bender charts · Published November 8, 2026
Mark for a 14″ stub, 3/4″ rigid
5-1/2″
On a Greenlee 1800, measured from the end of the stick. The mark lines up with the hook.
Bender values: Greenlee 1800 Mechanical Bender instruction manual, page 6; Greenlee 1800 Mechanical Bender instruction manual, page 11.

Your own marks
Bendbook draws every mark for the bender in your hand, numbered in bending order. Offline.
The Greenlee 1800 is a mechanical bender for rigid and IMC, and a stub on it is marked to the hook, not to an arrow as on a hand bender's head. For a 90° stub, subtract the take-up from the stub height and put that one mark on the hook. The charts below give the published values for the 3/4″ rigid/IMC and 1″ rigid/IMC shoes.
The published chart for 3/4″ rigid
Greenlee 1800, 3/4″ rigid/IMC: the published values
| Value | Published | Source |
|---|---|---|
| Take-up (deduct) for a 90° stub | 8-1/2″ | Greenlee 1800 Mechanical Bender instruction manual, page 6 |
| Centerline radius | 4-13/16″ | Greenlee 1800 Mechanical Bender instruction manual, page 11 |
| Shortest stub | 9-1/2″ | Greenlee 1800 Mechanical Bender instruction manual, page 6 |
| Hook distance | 3-3/16″ | Greenlee 1800 Mechanical Bender instruction manual, page 11 |
Greenlee 1800, 3/4″ rigid/IMC: where to mark a 90° stub
| Stub height | Mark from the end | Line up with |
|---|---|---|
| 10″ | 1-1/2″ | Hook (stub deduct) |
| 12″ | 3-1/2″ | Hook (stub deduct) |
| 14″ | 5-1/2″ | Hook (stub deduct) |
| 16″ | 7-1/2″ | Hook (stub deduct) |
| 18″ | 9-1/2″ | Hook (stub deduct) |
| 20″ | 11-1/2″ | Hook (stub deduct) |
| 24″ | 15-1/2″ | Hook (stub deduct) |
| 30″ | 21-1/2″ | Hook (stub deduct) |
Greenlee 1800, 3/4″ rigid/IMC: offset multipliers and shrink
| Angle | Multiplier (printed) | Multiplier (exact) | Shrink per inch (printed) | Shrink per inch (exact) |
|---|---|---|---|---|
| 10° | 6 | 5.759 | 1/16″ | 1/16″ |
| 15° | 3.86 | 3.864 | 1/8″ | 1/8″ |
| 22-1/2° | 2.6 | 2.613 | 3/16″ | 3/16″ |
| 30° | 2 | 2 | 1/4″ | 1/4″ |
| 45° | 1.4 | 1.414 | 3/8″ | 7/16″ |
| 60° | 1.2 | 1.155 | 1/2″ | 9/16″ |
Printed values: Greenlee Use Guide, Site-Rite 840–844 hand benders, page 9.
Greenlee 1800, 3/4″ rigid/IMC: offsets, distance between bends and shrink
| Depth | 22-1/2° | 30° | 45° |
|---|---|---|---|
| 2″ | 5-3/16″ apart, 3/8″ shrink | 4″ apart, 1/2″ shrink | 2-13/16″ apart, 3/4″ shrink |
| 3″ | 7-13/16″ apart, 9/16″ shrink | 6″ apart, 3/4″ shrink | 4-3/16″ apart, 1-1/8″ shrink |
| 4″ | 10-3/8″ apart, 3/4″ shrink | 8″ apart, 1″ shrink | 5-5/8″ apart, 1-1/2″ shrink |
| 5″ | 13″ apart, 15/16″ shrink | 10″ apart, 1-1/4″ shrink | 7″ apart, 1-7/8″ shrink |
| 6″ | 15-5/8″ apart, 1-1/8″ shrink | 12″ apart, 1-1/2″ shrink | 8-3/8″ apart, 2-1/4″ shrink |
| 8″ | 20-13/16″ apart, 1-1/2″ shrink | 16″ apart, 2″ shrink | 11-3/16″ apart, 3″ shrink |
| 10″ | 26″ apart, 1-7/8″ shrink | 20″ apart, 2-1/2″ shrink | 14″ apart, 3-3/4″ shrink |
Where the maker prints no value for an angle, the exact geometry is shown.
Calculate this bend in Bendbook. Pick your bender, type your measurements, and every mark is drawn on the stick for you.
The published chart for 1″ rigid
Greenlee 1800, 1″ rigid/IMC: the published values
| Value | Published | Source |
|---|---|---|
| Take-up (deduct) for a 90° stub | 11″ | Greenlee 1800 Mechanical Bender instruction manual, page 6 |
| Centerline radius | 6-1/16″ | Greenlee 1800 Mechanical Bender instruction manual, page 12 |
| Shortest stub | 12″ | Greenlee 1800 Mechanical Bender instruction manual, page 6 |
| Hook distance | 4-5/16″ | Greenlee 1800 Mechanical Bender instruction manual, page 12 |
Greenlee 1800, 1″ rigid/IMC: where to mark a 90° stub
| Stub height | Mark from the end | Line up with |
|---|---|---|
| 12″ | 1″ | Hook (stub deduct) |
| 14″ | 3″ | Hook (stub deduct) |
| 16″ | 5″ | Hook (stub deduct) |
| 18″ | 7″ | Hook (stub deduct) |
| 20″ | 9″ | Hook (stub deduct) |
| 24″ | 13″ | Hook (stub deduct) |
| 30″ | 19″ | Hook (stub deduct) |
Greenlee 1800, 1″ rigid/IMC: offset multipliers and shrink
| Angle | Multiplier (printed) | Multiplier (exact) | Shrink per inch (printed) | Shrink per inch (exact) |
|---|---|---|---|---|
| 10° | 6 | 5.759 | 1/16″ | 1/16″ |
| 15° | 3.86 | 3.864 | 1/8″ | 1/8″ |
| 22-1/2° | 2.6 | 2.613 | 3/16″ | 3/16″ |
| 30° | 2 | 2 | 1/4″ | 1/4″ |
| 45° | 1.4 | 1.414 | 3/8″ | 7/16″ |
| 60° | 1.2 | 1.155 | 1/2″ | 9/16″ |
Printed values: Greenlee Use Guide, Site-Rite 840–844 hand benders, page 9.
Greenlee 1800, 1″ rigid/IMC: offsets, distance between bends and shrink
| Depth | 22-1/2° | 30° | 45° |
|---|---|---|---|
| 2″ | 5-3/16″ apart, 3/8″ shrink | 4″ apart, 1/2″ shrink | 2-13/16″ apart, 3/4″ shrink |
| 3″ | 7-13/16″ apart, 9/16″ shrink | 6″ apart, 3/4″ shrink | 4-3/16″ apart, 1-1/8″ shrink |
| 4″ | 10-3/8″ apart, 3/4″ shrink | 8″ apart, 1″ shrink | 5-5/8″ apart, 1-1/2″ shrink |
| 5″ | 13″ apart, 15/16″ shrink | 10″ apart, 1-1/4″ shrink | 7″ apart, 1-7/8″ shrink |
| 6″ | 15-5/8″ apart, 1-1/8″ shrink | 12″ apart, 1-1/2″ shrink | 8-3/8″ apart, 2-1/4″ shrink |
| 8″ | 20-13/16″ apart, 1-1/2″ shrink | 16″ apart, 2″ shrink | 11-3/16″ apart, 3″ shrink |
| 10″ | 26″ apart, 1-7/8″ shrink | 20″ apart, 2-1/2″ shrink | 14″ apart, 3-3/4″ shrink |
Where the maker prints no value for an angle, the exact geometry is shown.
Reading the charts
Each shoe has its own take-up. Take-up changes with conduit size, so do not carry one from the 3/4″ rigid shoe to the 1″ rigid shoe. Compare only against benders for the same conduit type and size. The Greenlee conduit bender chart and the hand bender take-up chart cover the hand benders.
Each chart also lists the shortest stub the shoe will make. If you need a shorter stub than that, you cannot get it by moving the mark: bend a taller stub and cut it down.
The hook, not the arrow
On a hand bender you line the mark up with the arrow on the head. On the 1800 the mark lines up with the hook. Line up with the hook and nothing else.
The degree markings only show how far the bend has gone. They are not where the mark goes. If you are used to the arrow on a hand bender, this is the habit to break.
Worked example: a 14 inch stub in 3/4″ rigid
- Stub height
- 14″
| Mark | From the end | Line up with | Bend | Direction |
|---|---|---|---|---|
| 1 | 5-1/2″ | Hook (stub deduct) | 90° | First bend |
- Take-up
- 8-1/2″
- Gain
- 2-1/16″
Bender values: Greenlee 1800 Mechanical Bender instruction manual, page 6; Greenlee 1800 Mechanical Bender instruction manual, page 11.
There is only one mark on the stick. The stub height runs from the end of the stick to the back of the 90, so measure the finished stub the same way. For the same bend on a hand bender, see how to bend a 90 degree stub-up.
Steps
- Check which shoe is on the bender: 3/4″ rigid/IMC or 1″ rigid/IMC.
- Measure the stub height you need. Decide which end of the stick will rise.
- Subtract the take-up for that shoe from the stub height: 8-1/2″ on the 3/4″ rigid shoe, 11″ on the 1″ rigid shoe.
- Measure that distance from the end that will rise and make one mark there. Square it around the stick so you can see it from the bending side.
- Seat the stick in the shoe and line the mark up with the hook.
- Bend to 90°. Rigid springs back, so release the load before you judge the bend.
- Check the stub with a level. If it is short of plumb, bend a little more and check again.
- Measure the finished stub from the end of the stick to the back of the 90.
Mistakes that cost a stick
- Lining the mark up with the wrong reference. On the 1800 the mark goes on the hook, not on the degree markings.
- Marking the full stub height. Only the stub height less the take-up is marked. Mark the full height and the stub comes out too tall.
- Measuring from the wrong end. The stub rises from the end you measured from. Check this before you bend.
- Taking the wrong take-up. The 3/4″ rigid and 1″ rigid shoes have different take-ups. Check the shoe on the bender before you read the chart.
- Stopping the moment the bender reads 90°. Rigid springs back, so the stub can sit short of plumb once you release it. Check with a level after release.
- Bending offsets or saddles from the stub marks. Use the multipliers on the chart for an offset, and see three-point saddle and conduit kick for those setups.
Check every mark against your own bender before you bend a full run. A published value is only as good as the shoe it was printed for.
Questions
Is the 1800's take-up the same as a hand bender's?
No. Each bender has its own published take-up for each conduit type and size, and the 1800 has one for each shoe, shown above. Compare only against a bender for the same conduit type and size.
Does the 1800 bend EMT?
This page covers only the rigid/IMC shoes in the charts above. For EMT, use the chart for the bender you are bending on.
Where do I find the offset multipliers for the 1800?
They are in the charts above, one for each shoe. For more on a given angle, see 30 degrees, 22-1/2 degrees or 10 degrees. For shrink, see the shrink chart.
How many bends can I put between pull points?
For rigid metal conduit the limit is in NEC 344.24, and for IMC in 342.24. Count your bends before you start. The guides index lists the other bender charts, including the Klein conduit bender chart.
Check against your own bender. The numbers on this page use the values the maker publishes for the bender named; where the maker prints none, they are worked out from the geometry of the bend. Shoes wear, conduit varies and springback differs, so make one test bend and adjust before you bend the run.